You can get up-to-date information and an interactive map on all road works in Scotland via Scottish Roads Works while any work taking place on a trunk road or motorway can be found at Traffic Scotland.
Emergency road works
- Reason for emergency works: Emergency drainage repairs
- Town: Bearsden
- Road affected: Iain Road between its junction with Westbourne Crescent and Iain Drive.
- Duration: From 6pm Sunday 9 February till 6pm 2 March 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
Alternative routes will be by way of Iain Drive, Whitehurst, the A810 Duntocher Road, Nithsdale Crescent, Rosslyn Road, Eagle Crescent, Fairway and Westbourne Crescent, Bearsden, and these routes will be signposted.
Scheduled road closures
- Reason for closure: EDC Roads Service is to carry out carriageway resurfacing works
- Town: Bearsden
- Road affected: Albert Drive, between its junctions with Kessington Road and Woodvale Avenue
- Duration: 6am on Monday 24 March 2025 until 6pm on Sunday 30 March 2025.
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
Alternative routes will be by way of Kessington Road, Rannoch Drive, Hutchison Drive and Woodvale Avenue, Bearsden, and these routes will be sign posted.
- Reason for closure: Council Roads Service is to carry out carriageway resurfacing works
- Town: Bearsden
- Roads affected: Rannoch Drive between its junctions with Kessington Road and the A81 Maryhill Road
- Duration: 6am on 9 March until 6pm on Sunday 23 March 2025
- Notes: The temporary road closure will be carried out in two phases.
Alternative routes will be by way of Rannoch Drive, Kessington Road, the A81 Milngavie Road and Maryhill Road, Bearsden, and these routes will be sign posted. Internal diversion routes will also be sign posted.
Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
- Reason for closure: EDC Drainage Investigation Works
- Town: Bishopbriggs
- Road affected: Crowhill Road between its junction with the A803 Kirkintilloch Road and its junction with Emerson Road West
- Duration: 6am until 6pm on Friday 28 February 2025
- Notes: All classes of vehicle prohibited, except vehicles engaged in the works, and those vehicles requiring access to properties and land adjacent to the closed section of road when its safe and practical to do so during the works
Alternative route - Vehicles on the north side of the closure should proceed southwestwards then southwards on the A803 Kirkintilloch Road then eastwards on Colston Road then northwards and eastwards on the B812 Auch-inairn Road then northwards on Crowhill Road to the south side of the closure.
- Reason for closure: Council roads service carrying out carriageway resurfacing works
- Town: Bishopbriggs
- Road affected: Ness Avenue, Maree Gardens, Lochy Gardens and Rannoch Gardens from their junctions with Rannoch Avenue
- Duration: 12.01am on Monday 17 February 2025 until 11.59pm on Friday 21 February 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
There are no alternative routes.
- Reason for closure: Carriageway Resurfacing Works
- Town: Bishopbriggs
- Road affected: Teviot Avenue from its junction with Meadowburn and its junction with Heriot Crescent
- Duration: 12.01am Monday 17 February 2025 until 11.59pm on Friday 21 February 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
Alternative routes will be by way of Meadowburn, Lyne Croft, Lendale Lane, Mennock Drive, Yarrow Road and Heriot Crescent, Bishopbriggs, and these routes will be sign posted.
- Reason for closure: EDC Roads Service is to carry out carriageway resurfacing works.
- Town: Kirkintilloch
- Road affected: Campsie Road between its junctions with Campsie Road, near Kirkintilloch and the A891 Campsie Road, Lennoxtown
- Duration: 6am on Sunday 2 March until 6pm on Sunday 9 March 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties and land adjacent to the closed section of road when its safe and practical to do so during the works.
Alternative routes, will be by way of the A891 Campsie Road, Lennoxtown and Milton of Campsie, the B757 Birdston Road, Milton of Campsie, and Milton Road, Kirkintilloch, the A803 Glasgow Road and Kirkintilloch Road, Kirkintilloch, the A807 Torrance Road, the B822 Main Street and Campsie Road, Torrance, and these routes will be sign posted.
- Reason for closure: Contractor carrying out various groundworks including the formation of a new access. These works are associated with the new Cala Housing Development presently under construction. There are also repairs being carried out on the existing former railway bridge on Chryston Road, due to corrosion discovered during the site investigation
- Road affected: Chryston Road, Fauldhead, at a location to the east of its junction with Market Road, Kirkintilloch
- Duration: Sunday 22 September 2024 until 6pm on 17 September 2025
- Notes: In order to prevent danger to the public arising from damage to the structural integrity of the bridge over the former railway bridge and for the works to be carried out in a safe manner, East Dunbartonshire Council will require to extend the existing temporary road closure on Chryston Road Fauldhead, between its junctions with Market Road, Kirkintilloch, and Sauchenhall Road/Muckcroft Road from 6pm on Sunday 22 September 2024 until 6pm on Friday 31 March 2025
Alternative routes are be by of Sauchenhall Road, Gartshore Road, Mollins Road, the B8048 Waterside Road, Market Road, Kirkintilloch, Calfmuir Road, and Muckcroft Road, and these routes are presently being sign posted
Access to the closed section of road is presently only maintained for vehicles engaged in the works and those vehicles requiring access to properties and land adjacent the closed section of road. There is no access through the closed section of road for emergency service vehicles
- Reason for closure: EDC Roads Service is to carry out carriageway resurfacing works.
- Town: Kirkintilloch
- Road affected: Southbank Road between its junctions with Townhead and Southbank Drive, Kirkintilloch.
- Duration: 6.00am from Sunday 16 February till 6.00pm Sunday 23 February 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
- Alternative routes will be by way of Southbank Drive, Donaldson Street, Marina Way, the B757 Lenzie Road, Townhead, Cowgate, Catherine Street, the A806 New Lairdsland Road and Parliament Road, Kirkintilloch, and these routes will be sign posted.
- Reason for closure: To allow a crane to be located on the centre of the carriageway and lift materials for SPEN works
- Town: Lenzie
- Road affected: Gallowhill Avenue at its junction with the B757 Kirintilloch Road and its junction with The Grange
- Duration: 9am on Tuesday 11 March until 6pm on Wednesday 12 March 2025
- Notes: All classes of vehicles prohibited (except vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works).
Alternative routes will be by of Gallowhill Avenue, Gallowhill Road, the B757 Kirkintilloch Road, and Beech Road, Lenzie, and these routes will be sign posted.
- Reason for closure: Emergency SGN gas main repairs
- Town: Lenzie
- Road affected: The B819 Lindsaybeg Road between its junction with Orchard Brae and its junction with Orchard Field
- Duration: 2pm on Monday 10 February 2025 until 18.00 hours on Monday 3 March 2025
- Notes: All classes of vehicles prohibited (except vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works).
Alternative routes will be by of the B819 Lindsaybeg Road, the B757 Auchinloch Road, the B819 Crosshill Road, Boghead Road, Gallowhill Road, the B757 Kirkintilloch Road, Garngaber Avenue, Woodilee Road, and the A806 Initiative Road, Lenzie, and these routes have been sign posted.
- Reason for closure: Carriageway resurfacing works
- Town: Milngavie
- Road affected: Allander Road from its junction with Ellangowan Road over its entire length
- Duration: 6am on Monday 24 February 2025 until 6pm on Friday 28 February 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
There are no alternative routes.
- Reason for closure: Road works
- Road affected: Campsie Drive, Milngavie between its north-eastmost junction with Middleton Drive, Milngavie and its south-westmost junction with Middleton Drive, Milngavie
- Town: Milngavie
- Duration: 6am on Monday 3 March 2025 until 6pm on Friday 14 March 2025
- Notes: All Classes of vehicles prohibited(except vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works).
The alternative routes will be by way of Middleton Drive, Campsie Drive and Lynn Drive, Milngavie and these routes will be signposted.
- Reason for closure: BT Works
- Town: Torrance
- Road affected: Tower Road, near Torrance between its junction with Barraston Road and its junction with Glen Orchard Road
- Duration: 09.30am until 3.30pm on Thursday 6 March 2025
- Notes: Access to the closed section of road will only be maintained for emergency service vehicles, vehicles engaged in the works and those vehicles requiring access to properties adjacent to the closed section of road when its safe and practical to do so during the works.
Alternative routes are by of Glen Orchard Road, Tower Road, Craigmaddie Road, the A807 Balmore Road, Barraston Road, West Balgrochan Road, the B822 Main Street, Torrance, and these routes will be sign posted.
Scheduled temporary traffic management
- Reason for temporary traffic management: SGN is to carry out gas main replacement works
- Town: Bearsden
- Road affected: Canniesburn Road, Bearsden, between its junction with the A809 Drymen Road and a point north of its junction with Tweed Drive
- Duration: 9.30am on Monday 6 January till Thursday 6 March 2025
- Notes: In order for the works to be carried out in a safe manner, rolling temporary three and four way traffic signals incorporating pedestrian crossing facilities as required will be used to control traffic movements. The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
- Reason for temporary traffic management: EDC Roads Operations is to carry out footway resurfacing works
- Town: Bearsden
- Road affected: A809 Drymen Road, Bearsden, between its junctions with A809 Stockiemuir Road and Gartconnell Drive
- Duration: 9.30am on Monday 24 February 2025 for approximately six weeks
- Notes: In order for the works to be carried out in a safe manner, rolling temporary four way traffic signals incorporating pedestrian crossing facilities as required will be used. The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
- Reason for temporary traffic management: Advance Construction Scotland is to carry out various works including new footway works, new drainage installations and a new temporary construction access
- Town: Bishopbriggs
- Road affected: Auchinairn Road between a point east of its junction with Greenacres Roundabout and a point east of its junction with Auchinairn Roundabout
- Duration: 9.30am on Monday 3 March 2025 for a period of approximately three months
- Notes: In order for the works to be carried out in a safe manner, rolling temporary two, four and five way traffic signals incorporating pedestrian crossing facilities as required, will be used to control traffic movements.
- Temporary two way traffic signals will be used to control traffic movements on the B812 Auchinairn Road east of its junction with Auchinairn Road, Bishopbriggs
- Temporary five way traffic signals will be used to control traffic movements on the B812 Auchinairn Road at its junctions with Wester Lumloch Road, Miller Drive Robroyston Road at Auchinairn Roundabout, Bishopbriggs
- Temporary two way traffic signals will be used to control traffic movements on the B812 Auchinairn Road from a point west of its junction with Auchinairn Roundabout to a point east of its junction with Greenacres Roudabout, Bishopbriggs
- Temporary four way traffic signals will be used to control traffic movements on Miller Drive at Lumloch Drive, Smith Way at the roundabout, Bishopbriggs.
The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
- Reason for temporary traffic management: A contractor is to carry out works associated with the installation of a new traffic signal controlled junction
- Town: Bishopbriggs
- Road affected: Kirkintilloch Road at its junction with Meadowburn
- Duration: 9.30am on Monday 17 March till the 14 April 2025
- Notes: The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
- Reason for temporary traffic management: A contractor is to remove a tree
- Town: Bishopbriggs
- Road affected: Westerhill Road opposite its junction with Wellington Road
- Duration: 9.30am to 3.30pm Monday 24 February 2025
- Notes: In order for the works to be carried out in a safe manner, temporary three way traffic signals will be used to control traffic movements. The temporary traffic signals will be manually controlled at all times. The use of temporary traffic signals may result in delays to traffic in the area.
- Reason for temporary traffic management: Scottish Water is to carry out repairs to damaged ironwork
- Town: Kirkintilloch
- Road affected: Townhead at its junction with Luggiebank Road
- Duration: 9.30am until 6pm on Sunday 16 March 2025.
- Notes:The temporary traffic signals will be manually controlled at all times. The use of temporary traffic signals may result in delays to traffic in the area.
Advance warning notification signs will be erected on street one week prior to the start of the works.
- Reason for temporary traffic management: BT is to carry out pole replacement works
- Town: Lennoxtown
- Road affected: B822 Crow Road near Roughcraig House
- Duration: 9.30am until 3.30pm on Friday 7 March 2025
- Notes: In order for the works to be carried out in a safe manner, temporary two way traffic signals will be used to control traffic movements. The temporary traffic signals will be manually controlled at all times.
- Reason for temporary traffic management: Council Transportation is to carry out various works associated with the active travel corridor.
- Town: Milngavie
- Road affected: A807 Auchenhowie Road, between a point east of its junction with Finlay Rise and Alllander Toll Roundabout.
- Duration: 9.30am on Monday 4 November till 4 April 2025
- Notes: This work is associated with the A807 Active Travel Corridor project.
The works area will be from east of the Rangers FC training ground to the Allander Toll roundabout. The works programme has been broken down into six phases, with each phase approximately 250m in length. In the interests of contractor and public health and safety, temporary traffic lights will be in place to manage the flow of traffic past each phase of work.
In order for the works to be carried out in a safe manner, rolling temporary two, three and four way traffic signals will be used to control traffic movements on Auchenhowie Road between a point east of its junction with Finlay Rise and Allander Toll Roundabout. The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
Further information on the project is available on the A807 Active Travel Corridor page.
- Reason for temporary traffic management:BT is to carry out core failure works
- Town: Milngavie
- Road affected: Douglas Street at its junction with Park Road, Craigdhu Road and Clober Road
- Duration: 9.30am on Saturday 15 February 2025 for approximately five days, during the school holidays.
- Notes: In order for the works to be carried out in a safe manner, the existing temporary traffic signals will require to be switched off and temporary four way traffic signals incorporating pedestrian crossing facilities will be used to control traffic movements. The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
- Reason for temporary traffic management: BT is to carry out pole replacement works
- Town: Milngavie
- Road affected:Hunter Road south of its junction with Kirk Street
- Duration:9.15am until 2.30pm on Monday 10 March 2025
- Notes: The temporary traffic signals will be manually controlled at all times. The use of temporary traffic signals may result in delays to traffic in the area.
Advance warning notification signs will be erected on street one week prior to the start of the works.
- Reason for temporary traffic management: Council Roads Service is to carry out civil works associated with the installation of new traffic signals
- Town: Milton of Campsie
- Road affected: A891 Campsie Road/Antermony Road at its junction with the B757 Birdston Road
- Duration: 9.30am on Monday 3 February till Monday 3 March or Monday 10 March 2025
- Notes: In order for the works to be carried out in a safe manner, the existing pedestrian crossing facility will require to be switched off and temporary three way traffic signals incorporating a pedestrian crossing facility will be used to control traffic movements. The temporary traffic signals will be manually controlled between 7am and 7pm, each day.
Scheduled temporary traffic restrictions
There are currently no scheduled traffic restrictions.
Scheduled temporary footpath restriction
Town: Kirkintilloch
Road affected: unnamed public footpath adjacent to Freeland Place/Luggiebank Road
Duration: 6am on Monday 17 March until 6pm on Sunday 27 April 2025.
Notes: Alternative routes for pedestrian will be by way of existing footpath network within Luggie Park, the existing underpass near the A806 Initiative Road/Parliament Road, existing footways on Parliament Road, Townhead, and Freeland Place, Kirkintilloch, and these routes will be sign posted.